Comprehensive Multi-Level
BOM Control
Multi-Level BOM for Precision Manufacturing
Enables manufacturers to define and manage product structures across multiple assembly levels. Configure parent-child relationships, sub-assemblies, component quantities, units of measure, revisions, effective dates, scrap factors, alternates, and phantom assemblies—all within a single BOM.
Key Benefits:
- Enhances MRP Accuracy
- Optimizes Inventory Levels
- Improved Production Planning
- Suitable for complex product structure
- Better Cost computation
- Scalable manufacturing process

How Multi Level works in WrkPlan?
-
Hierarchical Product structure-
Finished Goods with multi-level sub-assemblies and components creates a better structure.
-
BOM Explosion in MRP-
During MRP run the BOM automatically explodes to calculate material availability and cost and even places requisitions for purchase.
-
Integrated Routing & Work Centers-
Each BOM level can have its own routing, operations, work centers, and labor planning, enabling accurate scheduling and production execution.
-
End-to-End Costing and Traceability-
WrkPlan rolls up material, labor, and overhead costs across all BOM levels while maintaining complete traceability from raw materials to the finished product.
-
Independent Sub-Assembly Production-
Sub-assemblies can be manufactured and stocked separately or produced on demand, then consumed by the parent assembly during final production.




